Home / Services / Maintenance & AMC / Floor Failure Diagnosis & Site Audit
POLYZEN SUPPORT SERVICE

Floor Failure Diagnosis
& Site Audit

Before any repair is quoted, the floor has to be read. POLYZEN walks the area, maps every failure type, measures the substrate and the moisture in it, and issues a written recommendation that says what failed, why it failed, and what will hold.

Read from the slab upwards Substrate, moisture, bond, wear, use
Root CauseIdentified First
MoistureMeasured In-Slab
Written ReportFindings Recorded
Any InstallerOurs Or Not
01
OVERVIEW

What a floor audit establishes

A failed industrial floor rarely fails for one reason. Delamination, blistering, cracking and rapid wear each point to a different cause, and the same visible symptom can come from the slab, from moisture rising through it, from chemical attack, from the wrong system being specified, or from the way the floor was installed. A POLYZEN site audit separates these before anything is repaired, so the rectification addresses the cause rather than the symptom, and so the floor does not fail again in the same place.

• Delamination & blistering • Moisture and vapour drive • Chemical and thermal attack • Wear, impact and traffic
02
WHAT WE EXAMINE

The audit, layer by layer

The floor is read from the slab upwards, because a problem at the bottom shows itself at the top.

⟶ Tap a stage
05

Service Conditions

Traffic & Chemistry

Loads, traffic pattern, wash-down regime, spillage and temperature swings are recorded, because the same coating behaves very differently under a pallet truck than under a steel-wheeled forklift or a daily caustic wash.

03
POLYZEN APPLIED SYSTEM

Delivered as a POLYZEN Applied System

The audit is delivered as part of the POLYZEN Applied System, surveyed and reported by the same team that carries out the rectification, so nothing is lost between the finding and the fix. Scope, method and system selection follow from what the audit finds on site, not from a standard list.

04
METHOD & INTEGRITY

How findings are recorded and reported

Field checks follow recognised methods, and the report states what was measured, where it was measured, and under what conditions. POLYZEN reports the readings actually taken on site. It does not publish fabricated figures and it does not issue certification of any kind.

Moisture
Measured in-slab and at surface
Adhesion
Checked at representative points
Mapping
Failure zones recorded by area
POLYZEN Values
Per site record

Test locations, methods and conditions are recorded with each reading, and the report separates what was measured from what was inferred. Where structural distress is suspected, a structural engineer input is recommended. POLYZEN confirms system values on the product technical data sheet.

05
HOW THE AUDIT IS CARRIED OUT

Four steps on site

01

Site Walkover

The full area is walked with your maintenance team, and the history of the floor, its use and any earlier repairs are recorded.

02

Measurement

Moisture, adhesion, film thickness where accessible, and the extent of each failure type are measured and located.

03

Cause Analysis

Findings are read together to separate substrate, moisture, chemical and installation causes from one another.

04

Written Report

You receive a written recommendation setting out the scope, the method and the sequence for rectification.

06
WHAT IS CHECKED

The audit record

CheckedWhat it tells us
Substrate soundnessWhether the concrete itself can carry a new system
In-slab moistureWhether a coating will lift again after recoating
AdhesionWhere the bond is failing: film, interface or concrete
Film thicknessWhether the original system was applied as specified
Joint conditionWhether movement is tearing the floor at the joints
Crack patternWhether cracking is surface, structural or movement related
Chemical exposureWhether the system in place suits what is spilt on it
Traffic and loadingWhether wear matches the use or points to the wrong system
07
08
09
WARRANTY

What happens after the audit

The audit report is yours to use, whoever carries out the work. Where POLYZEN carries out the rectification, the repaired area is covered by a written warranty issued with the completion documents, and the audit findings form the baseline the work is measured against. The standard period on resin flooring systems is 12 months from handover, extendable to 24 months by written agreement, and applied waterproofing carries 5 years as standard. Read the full warranty terms.

10
FAQ

Floor failure diagnosis questions

What does a floor failure audit involve?
The floor is walked with your team, the failure types are mapped across the area, and moisture, adhesion and substrate condition are measured at representative points. The findings are read together to identify the cause, and you receive a written recommendation covering scope, method and sequence.
Will POLYZEN audit a floor it did not install?
Yes. Most audits are on floors installed by someone else. The audit establishes the existing system, its condition and the cause of failure from what is actually on the ground, without relying on the original specification.
Why does the cause matter if the repair looks the same?
It usually is not the same. A coating lifting because of moisture in the slab needs a different treatment from a coating lifting because of poor preparation, and treating the wrong one puts the failure back in the same place within months.
How long does an audit take?
It depends on the area, the number of failure types and how much of the floor can be released from production. The duration is agreed once the area and access are known.
Does production have to stop?
Usually not for the audit itself. Checks are taken at representative points and can be worked around a running shift, though a few locations may need to be released briefly.
Is the report shared in writing?
Yes. The findings, the locations checked and the recommendation are issued in writing, so they can be circulated internally and used for approvals.
What happens after the report?
You can proceed to rectification, place the floor on a maintenance rate contract, or simply hold the report. The options are set out in the recommendation. Maintenance & AMC
11

Not sure why the floor failed?

Send the area, the sector and what you are seeing. We will audit it and tell you what actually failed.