POLYZEN · Project Planning

Coverage Calculator

Tell us your project size and system — and get an exact, substrate-verified material schedule built for your floor. No guesswork.

1Enter your project area
2Choose your flooring system
Your Project Summary
Get Exact Coverage on WhatsApp

Exact coverage depends on substrate profile, applied thickness and system build-up — confirmed Per TDS for your project.

What Decides How Much Material You Need?

Floor coating coverage is never a single fixed number. Four project realities decide the true material quantity — which is why POLYZEN builds a verified schedule for every site instead of a generic estimate.

01. Substrate Profile

A mechanically prepared, ground or shot-blasted concrete surface absorbs and consumes material differently from a smooth slab. Surface porosity directly changes consumption.

02. System Thickness

A thin high-build coating and a multi-millimetre self-leveling or screed system carry very different material loads per square metre across the same floor area.

03. System Build-Up

Primer, body coat, broadcast aggregate and seal coat each add to the schedule. The full layer stack — not one product — defines total quantity.

04. Wastage & Detailing

Coving, edges, joints, ramps and site wastage are factored into a real material schedule so the floor is never under-ordered mid-application.